Some road fittings installed on the newly commissioned Second Niger bridge have been stolen by vandals, The PUNCH can exclusively report.
In response, the Federal Government has ordered security personnel to begin surveillance patrols on the bridge and surroundings to prevent a recurrence.
A source in the works ministry confirmed the theft on Wednesday, reporting that the expansion joint walkway on axis 330 of the bridge had been stolen.
The source said, “Unfortunately, It’s true. The stolen fitting is an element from the expansion joints of the bridge. Drivers on that road have to be careful as the damaged part can cause discomfort to motorists.”
On December 15, 2022, the Federal Government also opened the Second Niger Bridge for use to ease traffic in the South-East during the festive season.
The Second Niger Bridge was first proposed during the 1978/79 political campaign by then-candidate Shehu Shagari of the National Party of Nigeria.
Patterned after the Third Mainland Bridge in Lagos, the 1.6 kilometers long bridge linking Anambra and Delta states is to decongest traffic on the existing Niger Bridge, boost economic activities, and connect the South-East with the rest of the country.